Road work for Harrison County May 4-10

0
(0)
  • Route F – CLOSED at the Little Creek Bridge; bridge replacement.  Closed through July 2015.
  • Route YY – Pothole patching, May 4
  • Route B – From U.S. Hwy 136 to Route N; shoulder work, May 4 – 5
  • I-35 – Spraying, May 4 – 7
  • Route 146 – At the Sugar Creek Bridge; bridge maintenance, May 4 – 7 A temporary traffic signal will be in place to direct traffic.
  • Various routes – Spraying, May 4 – 7
  • Route U – Pothole patching, May 5
  • Route D – From Route M (Eagleville Road) to Route M (Washington Center); pothole patching, May 6 – 7
  • Route T – Two miles north of Route DD; culvert repair, May 6 – 7

How useful was this post?

Click on a star to rate it!

Average rating 0 / 5. Vote count: 0

No votes so far! Be the first to rate this post.

As you found this post useful...

Follow us on social media!

We are sorry that this post was not useful for you!

Let us improve this post!

Tell us how we can improve this post?